Regulatory status
The applicable EU or national rule and effective date, with legal source.
A legal obligation, a national Gate project and a tested connector are different things. This public register makes the distinction visible, including where evidence has not yet been verified.
The applicable EU or national rule and effective date, with legal source.
Whether a named authority system has a sandbox, tested interoperability and production operation.
Whether a scoped integration has been demonstrated, tested in pilot or proven in production.
| Jurisdiction | Legal source | National Gate / testability | Our adapter | Last verified |
|---|---|---|---|---|
| Finland | EU baseline only; national scope review required | NOT VERIFIED No test claim | NOT PRODUCTION TESTED | 24 Sep 2026 — EU source only |
| Poland | EU baseline only; national scope review required | NOT VERIFIED No test claim | NOT PRODUCTION TESTED | 24 Sep 2026 — EU source only |
| Belgium | EU baseline only; national scope review required | NOT VERIFIED No test claim | NOT PRODUCTION TESTED | 24 Sep 2026 — EU source only |
| Slovakia | EU baseline only; national scope review required | NOT VERIFIED No test claim | NOT PRODUCTION TESTED | 24 Sep 2026 — EU source only |
This is a monitoring watchlist, not evidence that a national eFTI Gate is available. Country-specific status will be updated only with official source, defined scope and test evidence. EU baseline: European Commission ↗.
Map the data, name the owner, define the evidence and decide what to test before implementation.